70 m Casino Vessel – Synchronous lift Docking Analysis
Zoom Photo
Structural assessment of a 70 m casino vessel to evaluate hull strength and load distribution during docking operations. The scope included docking load analysis, identification of critical support reactions, design and positioning of additional temporary docking supports, and preparation of engineering calculations and drawings to ensure safe dry-docking in compliance with class requirements.
